Wednesday, August 5, 2009

Drilled VS skin and disassembled

Drilled all of the attach holes in the Vertical Stabilizer skin out to their full #40 size, then disassembled the VS again for dimpling, edge de-burring, cleaning and priming.
Made some marks with a Sharpie pen so that it can be re-assembled in the right orientation.
Also - need to consider lighting on the vertical stabilizer, as I will need to make allowances for wiring it up before i close the rear spar onto the VS.
Probably just need to get some grommets and string, to pull the real wiring later.

No comments:

Post a Comment