Tuesday, August 25, 2009

Assembly of the bottom and top ends of the rudder assembly.
Fluting and final size drilled the top end.


Assembly of the bottom and top ends of the rudder assembly.
Fluting and final size drilled the top end.

Monday, August 24, 2009

Rudder skeleton

Finished fabricating R-716 and R-717, now assembling the bottom end of the rudder.

Sunday, August 23, 2009

Fabricating spacer and strips for the rudder

Utilized the bandsaw for the rudder bottom attach strips, which need to be fabricated.

The rudder has 2 parts which need to be fabricated from 2024-T3 aluminum, a spacer r-717 and these 2 strips.

Saturday, August 22, 2009

Rudder Stiffeners & new tools

Busy day today, went to pick up my new ( new to me anyway ) drill press and bandsaw.
Then continued the rudder stiffener trimming, using the snips, as it now seems like the easiest way.
Then cleco-d the stiffeners to the rudder.
Interesting to see how the trimming and the interlocking nature of the stiffeners means that the rudder skin can be closed very tightly and still have the stiffeners almost to the narrowest point.
Just ordered the last 2 needed stiffeners from Vans tonight.



Friday, August 21, 2009

Rudder Stiffener results


Well, after last nights difficulties with the rudder stiffeners, I consulted the good people on the RV-List at matronics.
The response was excellent, balanced between "buy a bandsaw and never look back" and "I was able to do it just fine with the snips using the appropriate left or right handed snips - Appropriately".
So tonight I found that by applying some patience, I was able to trim the stiffeners just fine with the snips and then use the scotchbrite wheel on the bench grinder to de-burr and soften the edges.
Still some more to do, and I need to get some extras from Vans.

Thursday, August 20, 2009

Rudder Stiffener woes


Started to trim the rudder stiffeners tonight, but it looks like i need to revise my approach.
The aviation snips, or my technique with them, really bends the part as it cuts it, in one case ( pictured ) cracking it, so that needs to be replaced. Researching other tools for cutting tonight.

Wednesday, August 19, 2009

Finished the Vertical Stabilizer


Rivetted on the rear spar and closed the vertical stabilizer tonight.
Now for the rudder...

Tuesday, August 18, 2009

VS rear spar - final rivet



AD5 rivets arrived today, so I was able to finish up the last rivet in the rear spar for the Vertical Stabilizer. ( it's the slightly bigger one )

Monday, August 17, 2009

Rudder stiffeners

Leaving the vertical stabilizer for tonight, starting on the rudder.
First step, cut the R815 rudder stiffeners to size, and, of course, &$@!?# it up, need to order more rudder stiffeners from vans tomorrow.

Sunday, August 16, 2009

Finished the skin rivets on the VS


And cleco-d on the rear spar, just need to fix the bad rivet on the hinge bracket and close up the Vertical Stabilizer.

Saturday, August 15, 2009

Flush rivetting the VS skin

One side done, of the center rivets which require the rivet gun.

Friday, August 14, 2009

VS Spars and Ribs Rivetted



Finished the remaining rivets on the VS rear spar ( apart from the 1 bad rivet, waiting for rivets to arrive for that ) and then rivetted the other ribs and spars for the Vertical Stabilizer.
Finally cleco-d on the skin, ready to start the skin rivets.

Thursday, August 13, 2009

Further rivets in the VS Spar

More riveting tonight in the VS Spar, including some flush rivets, which i was pleased with.
However, I was less pleased with this %&$# rivet attaching the hinge bracket last night, I've ordered some AN470AD5 rivets ( the next size up ) to put here after I drill out and clean up the hole.

Wednesday, August 12, 2009

Riveting the VS spar

It's been a few days, the primer took that long to dry properly so that i can rivet without being concerned with it. Got a lot of the universal head rivets ( AN470AD ) set in the spar tonight.

Sunday, August 9, 2009

Finished priming the VS spars and ribs

This afternoon I flipped over the spars and ribs and primed them. I am not priming the al-clad skin interior, unless I end up scratching it later.
The primer has not set fully yet, so I am not proceeding to fully cleco it together for riveting tonight.

Dimpling and priming the VS

Dimpled all of the remaining holes on the Vertical Stabilizer. Then cleaned the ribs and spars thoroughly, using metal prep #79 to get down to the metal, and finally primed the ribs and spars. I've primed the top sides tonight, tomorrow morning will flip them over and do the other side, and check if a second coat is required.

Friday, August 7, 2009

Dimpling the VS skin

Dimpled the 'harder to reach' holes on the VS skin tonight using the C frame.
Only hit my thumb with the hammer a few times, reminds me of the joke -"When I nod my head - you hit it."

Thursday, August 6, 2009

VS front spar countersinking and dimpling

Deburred and softened the edges on the vertical stabilizer spars, ribs and skin.
Then machine countersunk the holes at the bottom - front facing holes in the front spar reinforcement bar and dimpled the corresponding holes in the front spar itself.

Wednesday, August 5, 2009

Drilled VS skin and disassembled

Drilled all of the attach holes in the Vertical Stabilizer skin out to their full #40 size, then disassembled the VS again for dimpling, edge de-burring, cleaning and priming.
Made some marks with a Sharpie pen so that it can be re-assembled in the right orientation.
Also - need to consider lighting on the vertical stabilizer, as I will need to make allowances for wiring it up before i close the rear spar onto the VS.
Probably just need to get some grommets and string, to pull the real wiring later.

Tuesday, August 4, 2009

VS initial assembly

Drilled all of the rib and spar holes out to their full #30 size.
Then attached the skin for the vertical stabilizer with clecos, ready to final size drill the skin holes ( to #40 )